P01
Softwell Digital Practical Manual
Practical 01 - IP Address Planning Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for IP Address Planning.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result IP Address Planning is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
Talk to Automation Advisor Get expert guidance for course selection, corporate training, project support and practical learning path.
Course Guidance Select the correct PLC SCADA, corporate, online or Industry 4.0 path.
Batch Support Get schedule, duration, mode and prerequisite guidance.
Project Advice Discuss plant, automation, reporting or training requirement.
P02
Softwell Digital Practical Manual
Practical 02 - Set Laptop Static IP Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Set Laptop Static IP.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Set Laptop Static IP is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
Skills & Tools You Will Learn Important automation skills are arranged for job-level, project-level and Industry 4.0 learning.
PLC Programming Ladder, SCL/ST, hardware, I/O mapping and troubleshooting.
SCADA / HMI Tags, screens, alarms, trends, scripts and reporting.
Industry 4.0 Tools OPC UA, SQL Server, Python, dashboards and Excel/PDF reports.
P03
Softwell Digital Practical Manual
Practical 03 - Ping Device Test Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Ping Device Test.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Ping Device Test is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P04
Softwell Digital Practical Manual
Practical 04 - Subnet Mask Practical Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Subnet Mask Practical.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Subnet Mask Practical is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
Why Choose Softwell Automation Learn automation with practical examples, industrial troubleshooting approach and complete IT/OT learning path.
Industry Experienced Trainer Real plant examples and project based training.
Hands-on Learning PLC logic, SCADA, VFD, communication and reporting practice.
Flexible Modes Online, classroom, corporate and in-plant options.
P05
Softwell Digital Practical Manual
Practical 05 - Gateway and Route Check Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Gateway and Route Check.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Gateway and Route Check is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
Course Contents / Curriculum The curriculum follows a practical sequence from fundamentals to project integration.
Level 01 Basic PLC, wiring, addressing and ladder logic.
Level 02 Advanced PLC, networking, SCADA and diagnostics.
Level 03 OPC UA, SQL, Python, reports and IT/OT integration.
P06
Softwell Digital Practical Manual
Practical 06 - Industrial Switch Login Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Industrial Switch Login.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Industrial Switch Login is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
Frequently Asked Questions About Industrial Networking Practical Manual Industrial Ethernet and IT OT Practical Manual Who can join this training? Students, freshers, working engineers, maintenance teams and corporate plant engineers can join based on their requirement.
Is practical training included? Yes. The training is focused on PLC, SCADA, HMI, VFD, communication, troubleshooting and project based practice.
Can I request online or corporate training? Yes. Softwell Automation provides classroom, online, corporate and in-plant training options.
P07
Softwell Digital Practical Manual
Practical 07 - Port Status Check Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Port Status Check.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Port Status Check is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P08
Softwell Digital Practical Manual
Practical 08 - Cable and Link Diagnostics Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Cable and Link Diagnostics.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Cable and Link Diagnostics is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P09
Softwell Digital Practical Manual
Practical 09 - Device Name and Hostname Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Device Name and Hostname.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Device Name and Hostname is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P10
Softwell Digital Practical Manual
Practical 10 - Modbus TCP Port Test Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Modbus TCP Port Test.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Modbus TCP Port Test is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P11
Softwell Digital Practical Manual
Practical 11 - PROFINET Device Scan Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for PROFINET Device Scan.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result PROFINET Device Scan is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P12
Softwell Digital Practical Manual
Practical 12 - EtherNet/IP Browse Test Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for EtherNet/IP Browse Test.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result EtherNet/IP Browse Test is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P13
Softwell Digital Practical Manual
Practical 13 - VLAN Basic Practical Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for VLAN Basic Practical.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result VLAN Basic Practical is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P14
Softwell Digital Practical Manual
Practical 14 - Firewall Rule Check Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Firewall Rule Check.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Firewall Rule Check is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P15
Softwell Digital Practical Manual
Practical 15 - Wireshark Packet Capture Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Wireshark Packet Capture.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Wireshark Packet Capture is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P16
Softwell Digital Practical Manual
Practical 16 - Latency and Packet Loss Test Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Latency and Packet Loss Test.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Latency and Packet Loss Test is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P17
Softwell Digital Practical Manual
Practical 17 - Network Fault Simulation Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Network Fault Simulation.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Network Fault Simulation is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P18
Softwell Digital Practical Manual
Practical 18 - Backup Switch Configuration Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Backup Switch Configuration.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Backup Switch Configuration is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P19
Softwell Digital Practical Manual
Practical 19 - IT OT Troubleshooting Report Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for IT OT Troubleshooting Report.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result IT OT Troubleshooting Report is completed, verified and documented inside the Industrial Networking Practical Manual workflow.
P20
Softwell Digital Practical Manual
Practical 20 - Final Industrial Networking Project Philosophy: Open the software, open the Softwell manual, and perform the practical.
Industrial Networking Ethernet Diagnostics IT OT
Software: Windows network tools, managed switch interface, Wireshark optionalSetup: Engineering laptop, industrial switch, PLC/HMI devices or simulated endpoints
01
STEP 01 Open Windows network tools and load the training project for Industrial Networking Practical Manual.
v
Done02
STEP 02 Create or open the practical object for Final Industrial Networking Project.
v
Done03
STEP 03 Configure the required tags, parameters, blocks or screen objects for this industrial networking workflow.
v
Done04
STEP 04 Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
DoneExpected Result Final Industrial Networking Project is completed, verified and documented inside the Industrial Networking Practical Manual workflow.