ABB Automation Builder PLC Manual
AC500 PLC Practical Manual

Official Philosophy: Open the software, open the Softwell Notebook, and perform the practical.

20 Matching Lab Practicals
Action Flow Manual
No Theory / Only Practical
Softwell Training Template

Softwell
Digital Practical
Notebook

[check] Open -> Click -> Select -> Download -> Test -> Complete

NO THEORY * ONLY PRACTICAL
P01

Softwell Digital Practical Manual

Practical 01 - Create Automation Builder Project

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Create Automation Builder Project.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Create Automation Builder Project as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Create Automation Builder Project.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalCreate Automation Builder ProjectPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Create Automation Builder Project is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

Talk to Automation Advisor

Get expert guidance for course selection, corporate training, project support and practical learning path.

Course GuidanceSelect the correct PLC SCADA, corporate, online or Industry 4.0 path.
Batch SupportGet schedule, duration, mode and prerequisite guidance.
Project AdviceDiscuss plant, automation, reporting or training requirement.
P02

Softwell Digital Practical Manual

Practical 02 - Select AC500 Controller

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Select AC500 Controller.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Select AC500 Controller as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Select AC500 Controller.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalSelect AC500 ControllerPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Select AC500 Controller is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

Skills & Tools You Will Learn

Important automation skills are arranged for job-level, project-level and Industry 4.0 learning.

PLC ProgrammingLadder, SCL/ST, hardware, I/O mapping and troubleshooting.
SCADA / HMITags, screens, alarms, trends, scripts and reporting.
Industry 4.0 ToolsOPC UA, SQL Server, Python, dashboards and Excel/PDF reports.
P03

Softwell Digital Practical Manual

Practical 03 - Configure Communication Path

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Configure Communication Path.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Configure Communication Path as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Configure Communication Path.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalConfigure Communication PathPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Configure Communication Path is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P04

Softwell Digital Practical Manual

Practical 04 - Create Global Variables

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Create Global Variables.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Create Global Variables as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Create Global Variables.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalCreate Global VariablesPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Create Global Variables is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

Why Choose Softwell Automation

Learn automation with practical examples, industrial troubleshooting approach and complete IT/OT learning path.

Industry Experienced TrainerReal plant examples and project based training.
Hands-on LearningPLC logic, SCADA, VFD, communication and reporting practice.
Flexible ModesOnline, classroom, corporate and in-plant options.
P05

Softwell Digital Practical Manual

Practical 05 - Digital Input Test

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Digital Input Test.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Digital Input Test as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Digital Input Test.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalDigital Input TestPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Digital Input Test is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

Course Contents / Curriculum

The curriculum follows a practical sequence from fundamentals to project integration.

Level 01Basic PLC, wiring, addressing and ladder logic.
Level 02Advanced PLC, networking, SCADA and diagnostics.
Level 03OPC UA, SQL, Python, reports and IT/OT integration.
P06

Softwell Digital Practical Manual

Practical 06 - Digital Output Test

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Digital Output Test.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Digital Output Test as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Digital Output Test.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalDigital Output TestPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Digital Output Test is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

Frequently Asked Questions About ABB Automation Builder PLC Manual AC500 PLC Practical Manual

Who can join this training?

Students, freshers, working engineers, maintenance teams and corporate plant engineers can join based on their requirement.

Is practical training included?

Yes. The training is focused on PLC, SCADA, HMI, VFD, communication, troubleshooting and project based practice.

Can I request online or corporate training?

Yes. Softwell Automation provides classroom, online, corporate and in-plant training options.

P07

Softwell Digital Practical Manual

Practical 07 - Start Stop Program

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Start Stop Program.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Start Stop Program as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Start Stop Program.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalStart Stop ProgramPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Start Stop Program is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P08

Softwell Digital Practical Manual

Practical 08 - Timer Function Block

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Timer Function Block.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Timer Function Block as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Timer Function Block.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalTimer Function BlockPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Timer Function Block is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P09

Softwell Digital Practical Manual

Practical 09 - Counter Function Block

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Counter Function Block.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Counter Function Block as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Counter Function Block.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalCounter Function BlockPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Counter Function Block is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P10

Softwell Digital Practical Manual

Practical 10 - Analog Scaling Program

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Analog Scaling Program.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Analog Scaling Program as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Analog Scaling Program.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalAnalog Scaling ProgramPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Analog Scaling Program is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P11

Softwell Digital Practical Manual

Practical 11 - Structured Text Function

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Structured Text Function.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Structured Text Function as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Structured Text Function.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalStructured Text FunctionPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Structured Text Function is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P12

Softwell Digital Practical Manual

Practical 12 - Function Block Instance

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Function Block Instance.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Function Block Instance as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Function Block Instance.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalFunction Block InstancePass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Function Block Instance is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P13

Softwell Digital Practical Manual

Practical 13 - Alarm Bit Logic

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Alarm Bit Logic.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Alarm Bit Logic as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Alarm Bit Logic.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalAlarm Bit LogicPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Alarm Bit Logic is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P14

Softwell Digital Practical Manual

Practical 14 - Build PLC Application

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Build PLC Application.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Build PLC Application as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Build PLC Application.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalBuild PLC ApplicationPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Build PLC Application is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P15

Softwell Digital Practical Manual

Practical 15 - Login to Controller

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Login to Controller.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Login to Controller as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Login to Controller.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalLogin to ControllerPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Login to Controller is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P16

Softwell Digital Practical Manual

Practical 16 - Download and Run

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Download and Run.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Download and Run as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Download and Run.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalDownload and RunPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Download and Run is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P17

Softwell Digital Practical Manual

Practical 17 - Online Monitoring

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Online Monitoring.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Online Monitoring as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Online Monitoring.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalOnline MonitoringPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Online Monitoring is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P18

Softwell Digital Practical Manual

Practical 18 - Connection Troubleshooting

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Connection Troubleshooting.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Connection Troubleshooting as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Connection Troubleshooting.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalConnection TroubleshootingPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Connection Troubleshooting is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P19

Softwell Digital Practical Manual

Practical 19 - Mini Machine Program

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Mini Machine Program.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Mini Machine Program as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Mini Machine Program.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalMini Machine ProgramPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Mini Machine Program is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

P20

Softwell Digital Practical Manual

Practical 20 - Final Automation Builder PLC Project

Philosophy: Open the software, open the Softwell manual, and perform the practical.

Automation BuilderAC500PLCIEC 61131-3
Software: ABB Automation Builder, AC500 PLC, Codesys-based IEC programming
Setup: Engineering laptop, AC500 PLC or simulator, Ethernet/USB communication

A. Step-by-Step Procedure

01
STEP 01
Open ABB Automation Builder and load the training project for ABB Automation Builder PLC Manual.
v
02
STEP 02
Create or open the practical object for Final Automation Builder PLC Project.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this ABB Automation Builder PLC workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Final Automation Builder PLC Project as complete.

B. Verification Checklist

  • The project/configuration completes without an unresolved compile or device error.
  • Online, simulation or runtime values respond in the expected sequence for Final Automation Builder PLC Project.
  • Critical addresses, parameters, units and initial states are checked against the lab sheet.
  • The saved project can be reopened and the result reproduced without hidden manual correction.

C. If the Result Is Wrong

SymptomProbable causeDiagnostic checkCorrective action
Compile or configuration errorUnresolved device, tag, type, address or parameterOpen the first diagnostic entry and trace it to the configured objectCorrect the source item, compile again and save a new evidence record
No online/runtime responseWrong connection, command source, permissions or scan stateMonitor live values from input through logic to outputRestore the verified connection/state and repeat one controlled test
Unstable or unexpected valueScaling, initial state, timing or version mismatchCompare raw and engineering values and review the installed versionCorrect scaling/state, reset the lab safely and retest

D. Student Evidence Record

Environment

Record software version, controller/device firmware, driver and license status.

Project evidence

Save the project/archive name, modified block/object and parameter list.

Runtime evidence

Capture a verified screenshot, trend, alarm, tag table or measured value.

Conclusion

Write the pass condition, fault tested, correction made and final observation.

VERIFIED SCREENSHOT / TREND / TAG-TABLE EVIDENCE
Insert a real capture from the learner's lab. Do not use a fabricated software screenshot.
PracticalFinal Automation Builder PLC ProjectPass conditionObserved result matches the stated objective and can be repeated.
Evidence filename________________Trainer / self-check________________

Expected Result

Final Automation Builder PLC Project is completed, verified and documented inside the ABB Automation Builder PLC Manual workflow.

Before You Start: Prerequisites, Tested Version, Safety and Evidence

This manual is a practical training workbook, not a substitute for the installed product manual or the site's approved engineering procedure. Record the exact software, firmware, license and hardware before following a step because menus and supported functions can vary by release.

Tested-version planning scope: Confirm Automation Builder V2.x, installed device repositories, AC500 CPU firmware and licensed libraries. Enter the exact lab-tested software, firmware and hardware in the record below before course delivery; never assume cross-version compatibility.

Environment record

Software build, firmware, device catalog, driver, communication interface and license status.

Safe lab boundary

Use an isolated training system. Follow electrical, mechanical, process and cybersecurity controls before energizing or downloading.

Evidence pack

Keep the source project, parameter/code export, screenshot/trend, fault test, correction and final pass result.

Technical review

Last reviewed by Softwell Automation Technical Training Team on 17 July 2026.

FieldLearner recordVerification
Software / firmware________________Matches the training device and official compatibility information
Project / backup________________Saved before and after the practical
Pass evidence________________Runtime value, trend, alarm, diagnostic or report attached
Fault tested________________Symptom, cause, check and corrective action documented

Practice, Viva and Extension Challenge

Practice

Change one approved input or parameter, predict the result, execute the test and explain any difference.

Viva

Explain the data flow, safety boundary, first diagnostic check and recovery method without opening the answer.

Extension challenge

Add one useful function while preserving the original pass criteria, alarm behavior and rollback path.

Graded mini-project

Combine at least three practicals, submit a versioned project and evidence pack, and demonstrate repeatable recovery.

ABB Automation Builder four-stage practical lab, runtime verification, diagnosis and backup workflow
Instructional workflow diagram: complete configuration, measurable verification, controlled diagnosis and recovery evidence in sequence.
ABB Library — official product documentation

Content status: Substantively reviewed and expanded 17 July 2026. Verify release-specific details against the linked official documentation.

Verified learning pathway

Practise This Manual with Guidance

Use the manual with trainer-led practicals, software exercises and troubleshooting support.

Content reviewed: 17 July 2026

☎ Call WhatsApp ✉ Email Enquire Now