FactoryTalk View SE Manual Site Edition SCADA Practical Manual
Official Philosophy: Open the software, open the Softwell Notebook, and perform the practical.
20 Matching Lab Practicals
Action Flow Manual
No Theory / Only Practical
Softwell Training Template
Softwell Digital Practical Notebook
[check] Open -> Click -> Select -> Download -> Test -> Complete
NO THEORY * ONLY PRACTICAL
P01
Softwell Digital Practical Manual
Practical 01 - Create SE Application
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Create SE Application.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Create SE Application as complete.
Expected Result
Create SE Application is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P02
Softwell Digital Practical Manual
Practical 02 - Set FactoryTalk Directory
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Set FactoryTalk Directory.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Set FactoryTalk Directory as complete.
Expected Result
Set FactoryTalk Directory is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P03
Softwell Digital Practical Manual
Practical 03 - Add FactoryTalk Linx Shortcut
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Add FactoryTalk Linx Shortcut.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Add FactoryTalk Linx Shortcut as complete.
Expected Result
Add FactoryTalk Linx Shortcut is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P04
Softwell Digital Practical Manual
Practical 04 - Create HMI Tags
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Create HMI Tags.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Create HMI Tags as complete.
Expected Result
Create HMI Tags is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P05
Softwell Digital Practical Manual
Practical 05 - Create Main Graphic Display
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Create Main Graphic Display.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Create Main Graphic Display as complete.
Expected Result
Create Main Graphic Display is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P06
Softwell Digital Practical Manual
Practical 06 - Add Numeric Display and Entry
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Add Numeric Display and Entry.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Add Numeric Display and Entry as complete.
Expected Result
Add Numeric Display and Entry is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P07
Softwell Digital Practical Manual
Practical 07 - Create Motor Control Display
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Create Motor Control Display.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Create Motor Control Display as complete.
Expected Result
Create Motor Control Display is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P08
Softwell Digital Practical Manual
Practical 08 - Configure Global Objects
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Configure Global Objects.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Configure Global Objects as complete.
Expected Result
Configure Global Objects is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P09
Softwell Digital Practical Manual
Practical 09 - Alarm and Event Setup
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Alarm and Event Setup.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Alarm and Event Setup as complete.
Expected Result
Alarm and Event Setup is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P10
Softwell Digital Practical Manual
Practical 10 - Alarm Summary Display
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Alarm Summary Display.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Alarm Summary Display as complete.
Expected Result
Alarm Summary Display is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P11
Softwell Digital Practical Manual
Practical 11 - Trend Display Practical
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Trend Display Practical.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Trend Display Practical as complete.
Expected Result
Trend Display Practical is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P12
Softwell Digital Practical Manual
Practical 12 - Data Log Model Setup
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Data Log Model Setup.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Data Log Model Setup as complete.
Expected Result
Data Log Model Setup is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P13
Softwell Digital Practical Manual
Practical 13 - User Security Setup
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for User Security Setup.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical User Security Setup as complete.
Expected Result
User Security Setup is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P14
Softwell Digital Practical Manual
Practical 14 - Macro and Parameter File
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Macro and Parameter File.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Macro and Parameter File as complete.
Expected Result
Macro and Parameter File is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P15
Softwell Digital Practical Manual
Practical 15 - SE Client Runtime Test
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for SE Client Runtime Test.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical SE Client Runtime Test as complete.
Expected Result
SE Client Runtime Test is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P16
Softwell Digital Practical Manual
Practical 16 - Display Navigation Test
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Display Navigation Test.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Display Navigation Test as complete.
Expected Result
Display Navigation Test is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P17
Softwell Digital Practical Manual
Practical 17 - Communication Diagnostics
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Communication Diagnostics.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Communication Diagnostics as complete.
Expected Result
Communication Diagnostics is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P18
Softwell Digital Practical Manual
Practical 18 - Backup Application
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Backup Application.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Backup Application as complete.
Expected Result
Backup Application is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P19
Softwell Digital Practical Manual
Practical 19 - Integrated SCADA Runtime Test
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Integrated SCADA Runtime Test.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Integrated SCADA Runtime Test as complete.
Expected Result
Integrated SCADA Runtime Test is completed, verified and documented inside the FactoryTalk View SE Manual workflow.
P20
Softwell Digital Practical Manual
Practical 20 - Final FactoryTalk View SE Project
Philosophy: Open the software, open the Softwell manual, and perform the practical.
FactoryTalk View SESCADAHMIAlarms
Software: FactoryTalk View Studio SE, FactoryTalk Linx, SE Client / Runtime Setup: Engineering laptop, FactoryTalk application, Logix tags or simulator
01
STEP 01
Open FactoryTalk View Studio SE and load the training project for FactoryTalk View SE Manual.
v
02
STEP 02
Create or open the practical object for Final FactoryTalk View SE Project.
v
03
STEP 03
Configure the required tags, parameters, blocks or screen objects for this FactoryTalk View SE workflow.
v
04
STEP 04
Run compile, simulation, runtime or online monitoring as applicable and verify the practical behavior.
v
05
STEP 05
Save the work, record the result and tick Practical Final FactoryTalk View SE Project as complete.
Expected Result
Final FactoryTalk View SE Project is completed, verified and documented inside the FactoryTalk View SE Manual workflow.